OC Public Works will complete a pavement rehabilitation of Silverado Canyon Road and adjacent and connecting local streets in January and February. Work will take place from 9 a.m. to 3 p.m. weekdays; access to residences may be limited during working hours.
The project will consist of grinding and paving Black Star Canyon Road and Thisa Way, as well as remedial repairs, including crack sealing, on Silverado Canyon Road, Kitterman Drive, Sleepy Hollow, Ladd Canyon Road and Belha Way.
For more information, contact Bruce Poma at 714-448-1672.
Nathan Percy, 714-796-2247
npercy@scng.com
Source: Oc Register
Road rehabilitation work to take place along Silverado Canyon Road
More from NewsMore posts in News »
- AAPI groups focus on the CA-47 race, viewing it as a potential pickup in 2024
- Arts for all: NEA chair will share her vision at Irvine Barclay Theater
- Two weeks later, what we know — and still don’t know — about Monterey Park shooter
- State news executives gather to work on trust in age of disinformation
- ‘It’s going to take some time’: Alhambra’s Lai Lai Ballroom seeks to buoy ‘healing process’ after shooting
More from Orange County NewsMore posts in Orange County News »
More from roadsMore posts in roads »
- Rideshare tips and news for Southern California commuters
- Life-sized dolls and mannequins don’t help you in the carpool lane
- Who’s responsible for cracked windshields on the freeway?
- How old do you have to be to legally drive an ATV in California?
- New no-car section of road inside Griffith Park aims to block cut-through traffic
Be First to Comment